Number of battery systems, inverters and meters varies per installation. IP addresses always follow the series structure in section 3.
Example diagram — number of batteries, inverters and meters varies per installation
All devices cabled via Cat6 to the internal switch in FlexControl. IP addresses set per the table below. Protocol must be Modbus TCP/IP – not Modbus RTU.
Replace [SiteID] with the correct value for the site. Assigned by TGN Energy – contact support@tgnenergy.com at commissioning.
| Component | IP Address | Series | Instrument | Status |
|---|---|---|---|---|
| Meter – Grid Input Consumption / peak shaving |
10.10.[SiteID].31 | 3x | Carlo Gavazzi EM24 | Mandatory |
| Meter – BESS Aggregated battery current |
10.10.[SiteID].32 | 3x | Acuvim II | Mandatory |
| Meter – PV Solar production |
10.10.[SiteID].33 | 3x | Carlo Gavazzi EM24 | Mandatory |
| Battery 1 BESS unit |
10.10.[SiteID].41 | 4x | BESS system | Per unit |
| Battery 2, 3 … One address per battery |
10.10.[SiteID].42 … | 4x | BESS system | Per unit |
| PV Control 1 Inverter control |
10.10.[SiteID].51 | 5x | PV inverter | Optional |
| PV Control 2, 3 … One address per inverter |
10.10.[SiteID].52 … | 5x | PV inverter | Optional |
.31 – .3x.41 – .4x.51 – .5xPlace the cabinet in the switchroom. Connect 230V supply and verify 24V DC internal voltage.
Connect the internet cable to port X1P1 on the NXT Step CyberBox. Required for remote monitoring and updates.
Mount Carlo Gavazzi EM24 (grid input and PV) and Acuvim II (BESS). Connect 5A current transformers where required.
Run Cat6 cable from each grid analyser, BESS unit and PV inverter to the Modbus TCP/IP switch in the FC cabinet.
Configure IP addresses on all devices. Always use Modbus TCP/IP. Verify that all devices respond on their assigned address.
All components are configured and started by an authorised electrician. Log all Modbus addresses and verify communication against the FC system.
| Module / component | Function | Connection |
|---|---|---|
| PLCM04 | RS485 extension (Modbus RTU) for HMI | Plug-in module, internal |
| TGN Modbus switch (external) | Extension for large installations | Cat6 to internal switch in FC cabinet |
| PV Control (active) | Active inverter regulation | Modbus TCP/IP, 5x series IP |
| BESS AUX supply | Auxiliary power for battery management | 230V from BESS cabinet |